Advanced Gantt Chart

Interactive Gantt chart for visualizing hierarchical project schedules, with automatic parent task rollups, dual baseline and actual timeline bars, and rule-based conditional formatting.

Preview of Advanced Gantt Chart

What it does.

Project teams frequently need to track planned versus actual progress across a work breakdown structure, individual tasks rolling up into phases and phases into a full program, without losing sight of dates, dependencies, and risk at any level. Power BI has no native Gantt visual, leaving users to either rely on external project management tools or fall back to tables and bar charts that cannot represent hierarchy, dual timelines, or dependencies at all.

Advanced Gantt Chart solves this by rendering a task list, bound via a single self-referencing Parent Task ID field, as a full work breakdown structure. Parent and phase rows automatically roll up dates, progress, and milestones from their children live, with no manual entry or upstream DAX measure required. Every task shows a dual baseline and actual bar, so planned versus actual progress is visible at every level of the hierarchy, not just on leaf tasks.

Finish-to-start dependency arrows route automatically between tasks, with fan-out for multiple predecessors converging on one task. A Critical Path toggle flags the zero-slack chain through the dependency network without overriding the report's own legend coloring, and Pace Tracking shows whether an in-progress task is ahead, on track, or behind schedule relative to today.

Conditional formatting is available directly through Power BI's own native rule engine on the Data Colors card, letting report authors color bars automatically by any bound field with no custom DAX required. Milestones support multiple types per task, each with its own configurable shape, size, and color, and unlimited custom Details and Tooltip fields can be added beyond the standard task columns.

The visual supports Power BI's native interactions: cross-filtering, right-click context menus, rich tooltips, keyboard navigation, and high-contrast theming. A resizable, persisted WBS grid remembers expand and collapse state, column widths, and scroll position across sessions, and integrates naturally into any report without needing a separate project management tool outside Power BI.

What ships today, what’s next.

Available now16 capabilities

  • Interactive Gantt chart for hierarchical project schedules
  • Automatic parent task rollups, computed live from child tasks
  • Dual baseline and actual timeline bars with progress fill
  • Pace Tracking, shows whether a task is ahead, on track, or behind schedule
  • Configurable milestones, multiple types per task with independent shape, size, and color
  • Finish-to-start dependency arrows with automatic fan-out for multiple predecessors
  • Critical Path highlighting, without overriding legend colors
  • Cascading Delay projection for downstream schedule risk
  • Conditional formatting for automatic, rule-based bar coloring
  • Resizable, persisted WBS grid with expand/collapse, column resize, and search
  • Unlimited custom Details and Tooltip fields
  • Cross-filtering and native Power BI interaction support
  • Right-click context menu support
  • Rich tooltips with variance, pace, and resource detail
  • Keyboard accessibility and high-contrast theme support
  • User-friendly formatting pane configuration

On the roadmap2 planned

  • Support custom pace tracking logic
  • Resource-utilization view

Other custom visuals.

25 more visuals in the catalogue. All free to download.

01Free · AppSource

Error Bar

A dot-and-whisker chart for Power BI. Each point shows its value with a whisker for the uncertainty, give it bounds, or hand it raw rows and it computes the confidence interval itself.

Learn more →
02Free · AppSource

Dual Hierarchy Decomposition Tree Pro

DAX-driven KPI tree with dual-axis drill-down, per-KPI colors, icons, and Microsoft-certified Pro features.

Learn more →
03Free · AppSource

Advanced Sankey Diagram

Interactive Power BI Sankey diagram for visualizing multi-stage flow data, with automatic node-to-ribbon color gradients and rule-based conditional formatting.

Learn more →
04Free · AppSource

Sparkline KPI Card

KPI Card with Sparkline for Power BI that displays KPI values, previous period comparisons, targets, variance, trend indicators, and interactive sparklines in a compact, business-ready visual.

Learn more →
05Free · AppSource

Cluster Analysis Chart

A scatter plot that groups points into clusters by similarity using K-Means, DBSCAN, or Hierarchical clustering. Shows centroids, hulls, ellipses, outliers, and dendrograms, with no R or Python.

Learn more →
06Free · AppSource

Lollipop Chart

Compare one value across many categories with clean stems and markers on a shared scale, and track each category against its target.

Learn more →
07Free · AppSource

Bullet Chart

Compare performance against multiple targets with qualitative bands, variance, and small multiples.

Learn more →
09Free · AppSource

Radial Histogram

Interactive radial histogram, wedges radiating from a center point, area-correct by default.

Learn more →
10Free · AppSource

Pareto Chart

Sort causes largest first, accumulate them, and mark the vital few that reach your threshold.

Learn more →
11Free · AppSource

Win Loss Chart

A win/loss sparkline for Power BI. Each period is one equal-sized mark above or below a baseline, so streaks and form are visible at a glance across many rows at once.

Learn more →
12Free · AppSource

Waffle Chart

Show part-to-whole proportions, track progress toward targets, or break totals by category.

Learn more →
13Free · AppSource

Connected Scatter Plot

It plots two measures against each other and joins the points in time order, so the path, its direction and its turning points are visible at a glance, by group or in small multiples.

Learn more →
14Free · AppSource

Histogram

Interactive histogram for visualizing the distribution of a continuous measure, with flexible binning, weighted bin heights, and built in statistical overlays.

Learn more →
15Free · AppSource

Dual Axis Bar & Column Chart

Plot two measures on independent scales without dropping in a separate combo chart.

Learn more →
16Free · AppSource

Dual Hierarchy Decomposition Tree

Up to four KPIs per card across two hierarchy axes, with DAX-driven status colours.

Learn more →
17Free · AppSource

Multi KPI Decomposition Tree

Decompose up to five measures per node, with stacked bars on every branch.

Learn more →
18Free · AppSource

Arabic Matrix Table

Right-to-left matrix with Arabic labels, hierarchical rows, subtotals and grand totals.

Learn more →
19Free · AppSource

Arabic Stacked Bar Chart

RTL-native stacked bars with Arabic number units, small multiples and cross-filtering.

Learn more →
20Free · AppSource

Arabic Stacked Column Chart

RTL-native stacked columns matched to the Arabic Bar visual for consistent dashboards.

Learn more →
21Free · AppSource

Arabic Waterfall Chart

Sequential value walk for Arabic dashboards — variance, build-up and bridge analyses.

Learn more →
22Free · AppSource

Dumbbell Chart

Two markers per category on a shared scale, connected by a line that makes the gap immediately visible.

Learn more →
23Free · AppSource

Counts Plot

Visualise data distribution with dots scaled by frequency across category lanes.

Learn more →
24Free · AppSource

Jitter Plot

Show every data point with jitter or beeswarm layout for distribution analysis.

Learn more →
25Free · AppSource

Auto Single Select Slicer

Smart Power BI slicer with automatic first-value selection — reports never load with an empty filter.

Learn more →
26Free · AppSource

AutoSelect Slicer

Smart Power BI slicer with automatic selection across single-select and multi-select scenarios.

Learn more →

Need a custom Power BI visual built for your reporting?

Thirty minutes with a senior BI consultant. We’ll walk your report, scope the visual, and tell you whether a build makes sense.

Talk to our BI team →